Texas Room Day 28!

Whew. It's tiring watching John work! Today he got all the gas lines run under the room. We won't, however, be hooking the gas up this year as we don't plan on using it in the 2 1/2 weeks we have left here. So we will do that once we return next year. The commode was put in yesterday.

After that, John worked on getting the tub installed and the panels around the tub. It really looks nice. Terry spent most of the day cutting up cardboard to take to recycling and getting stuff in the trash barrels. I dry mopped the tile. John didn't want me to use the wet mop yet, but I was able to get some of the dust up.

Once we got that done, Terry got some stuff ready to return to Home Depot and after supper, we loaded up that stuff and headed out. We were gone about three hours. Returning the stuff was easy, but then we had more to buy. We did get a bathroom door. Whoo Hoo!

Tomorrow the water heater will be delivered along with the bath vanity, the refrigerator and the washer/dryer. The kitchen cabinets are due next week.

John plans on getting the skirting done tomorrow. I hope the wind dies down so it will be easier. We have had strong winds for two days. I think 35 mph winds with higher gusts. It has really been wicked, but that is part of living in the RGV.